Ningguo City Backup Water Source Relocation Project Water Pump Ship Project

       Project name:Ningguo Standby Water Source Relocation Project Water Intake Pump Boat Project
  Address:Ningguo,Xuancheng,Anhui
  Project purpose:Urban backup water source
  Main technical parameters of pump station
  Body size:18.7x9.9x1.3m
  Unit configuration:3 units(2 for use and 1 for backup)
  Single unit flow rate:460m3/h
  Lift:31m
  Power:75kW/set 380V
  Control method:ship end/shore end,local/remote control